• Mark created a new forum post in ATA 21 - Air Conditioning
    21-00-00 * AIR CONDITIONING - GENERAL - DESCRIPTION AND OPERATION
    21-00-21 * OIL SMOKE/FUME CONTAMINATION (REMOVAL) - MAINTENANCE PRACTICES
    21-20-11 * AIR CONDITIONING DUCTS - INSPECTION/CHECK
    21-21-00 * MAIN AIR DISTRIBUTION - DESCRIPTION AND OPERATION - MAINTENANCE PRACTICES - ADJUSTMENT TEST

       21-21-01 * Mix Manifold Semi-Flexible Air Duct Hose Maintenance Practices
       21-21-02 * Conditioned Air Ground Connector
       21-21-05 * Main Conditioned Air Distribution Duct Ice Screen - Maintenance Practices
    21-22-00 * FLIGHT COMPARTMENT AIR DISTRIBUTION - DESCRIPTION AND OPERATION - MAINTENANCE PRACTICES - ADJUSTMENT TEST
       21-22-01 * Flight Compartment Floor Outlets - Removal/Installation
       21-22-02 * Air Conditioning  Restrictor (Flow Control Control Orifice) Removal/Installation
       21-22-03 * Flight Compartment Overhead Outlet - Removal/Installation
       21-22-04 * Flight Deck Conditioned Air Muffler - Removal/Installation
       21-22-05 * Flight Deck Supply Fan - Removal/Installation
       21-22-06 * Flight Deck Supply Check Valve - Removal/Installation
       21-22-07 * External Air Supply Pressure Switch - Removal/Installation
    21-23-00 * CONDITIONED AIR DISTRIBUTION - DESCRIPTION AND OPERATION - MAINTENANCE PRACTICES - ADJUSTMENT TEST
       21-23-03 * Air Conditioning System Restrictors - Removal/Installation
       21-23-04 * Aft Galley Air Outlet - Removal/Installation
       21-23-05 * Return Air Grills - Maintenance Practices
       21-23-06 * Passenger Cabin Distribution Muffler - Removal/Installation
       21-23-07 * Air Conditioning System Ducts - Repairs
       21-23-08 * Forward Overboard Valve System - Maintenance Practices
       21-23-20 * Main Deck Cargo Compartment Air Distribution Shutoff Valves - Removal/Installation
    21-24-00 * GASPER AIR SYSTEM - DESCRIPTION AND OPERATION - MAINTENANCE PRACTICES - ADJUSTMENT TEST
       21-24-01 * Gasper Fan - Removal/Installation
       21-24-03 * Gasper Air Conditioning Duct Removal/Installation
       21-24-04 * Gasper Fan Current Sensor - Removal/Installation
    21-25-00 * RECIRCULATION SYSTEM - DESCRIPTION AND OPERATION - MAINTENANCE PRACTICES - ADJUSTMENT TEST
       21-25-01 * Recirculation Air Fan - Removal/Installation
       21-25-02 * Recirculation Air Filter - Removal/Installation
       21-25-03 * Recirculation Air Check Valve - Removal/Installation
       21-25-04 * Recirculation Fan Current Sensor - Removal/Installation
       21-25-05 * Recirculation Air Filter Box Assembly - Removal/Installation
    21-26-00 * VENTILATION SYSTEM - DESCRIPTION AND OPERATION - MAINTENANCE PRACTICES - ADJUSTMENT TEST
     
     21-26-01 * Aft Equipment/Lavatory/Galley Fan - Removal/Installation
       21-26-02 * Ventilation Check valve - Removal/Installation
       21-26-03 * Galley Ventilation Filter - Removal/Installation
       21-26-04 * Fan Current Sensor - Removal/Installation
       21-26-05 * ECS Fan Control Cards - Removal/Installation
       21-26-06 * Bulk Cargo Ventilation Fan - Removal/Installation
       21-26-07 * Galley Ventilation Muffler - Removal/Installation
       21-26-08 * Galley Ventilation Muffler - Removal/Installation
       21-26-09 * Bulk Cargo Ventilation Flapper Valve Solenoid - Removal/Installation
       21-26-10 * Forward Cargo Exhaust Valve - Removal/Installation
       21-26-11 * Forward Cargo Ground Exhaust Valves - Removal/Installation
       21-26-12 * Forward Cargo Ground Exhaust Valve - Removal/Installation
       21-26-13 * SATCOM Air Inlet Screen - Maintenance Practices
       21-26-14 * Bulk Cargo Heat Mode Select Module - Removal/Installation
    21-28-00 * FORWARD CARGO AIR CONDITIONING DISTRIBUTION - DESCRIPTION AND OPERATION - MAINTENANCE PRACTICES - ADJUSTMENT TEST
       21-28-01 * Forward Cargo Air Conditioning Shutoff Valve - Removal/Installation
       21-28-02 * Forward Cargo Vent Fan - Removal/installation
    21-29-00 * CREW REST AREA (CRA) AIR DISTRIBUTION SYSTEM - DESCRIPTION AND OPERATION - MAINTENANCE PRACTICES - ADJUSTMENT TEST
       
    21-29-01 * Crew Rest Area (CRA) Shutoff Valve - Removal/Installation
       21-29-02 * Crew Rest Area Supply Fan - Removal/Installation
       21-29-03 * Smoke Evacuation Valve - Removal Installation
       21-29-04 * Crew Rest Area Dual Modulating Valve - Removal/Installation
    21-31-00 * CABIN PRESSURE CONTROL SYSTEM - DESCRIPTION OPERATION - MAINTENANCE PRACTICES - ADJUSTMENT TEST
       21-31-01 * Cabin Pressure Selector - Removal/Installation
       21-31-02 * Automatic Cabin Pressure Controller - Removal/Installation
       21-31-03 * Cabin Pressure Outflow Valve - Removal/Installation
       21-31-04 * Cabin Pressure Outflow Valve Actuator - Removal/Installation
       21-31-05 * Outflow Valve Actuator AC Motor - Removal/Installation
    21-32-00 * CABIN PRESSURE RELIEF SYSTEM - DESCRIPTION AND OPERATION - MAINTENANCE PRACTICES - ADJUSTMENT TEST
       21-32-01 * Positive Pressure Relief Valve - Maintenance Practices
       21-32-02 * Positive Pressure Relief Valve Filter - Removal/Installation
       21-32-03 * Door - Negative Pressure Relief - Maintenance Practices
       21-32-04 * PPRV Static Pressure Port - Removal/Installation
    21-33-00 * CABIN PRESSURE INDICATION AND WARNING -  MAINTENANCE PRACTICES - ADJUSTMENT TEST
       
    21-33-01 * Cabin Pressure Indicator - Removal/Installation
       21-33-04 * Remote Differential Pressure Sensor - Removal/Installation
       21-33-05 * Cabin Altitude Warning Switch - Removal/Installation
    21-40-00 * CARGO HEAT DUCT
       21-40-01 Cargo Heat Duct - Maintenance Practices
    21-43-00 * FORWARD CARGO COMPARTMENT HEATING SYSTEMS - DESCRIPTION and OPERATION
       21-43-01 * Forward Cargo Heat Shutoff Valve - Removal/Installation
       21-43-02 * Forward Cargo Heat Control Valve - Removal/Installation
       21-43-04 * Forward Cargo Sidewall Overheat Temperature Switch - Removal/Installation
       21-43-05 * Forward Cargo Heat Temperature Switches - Removal/Installation
       21-43-06 * Cargo Heat Control Panel Removal/Installation
       21-43-07 * Cargo Heat Duct Inspection/Check
    21-44-00 * AFT/BULK CARGO COMPARTMENT HEATING SYSTEM - DESCRIPTION and OPERATION  - MAINTENANCE PRACTICES - ADJUSTMENT TEST
     
     21-44-01 * Aft Cargo Heat Shutoff Valve - Removal/Installation
       21-44-02 * Aft Cargo Heat Control Valve - Removal/Installation
       21-44-03 * Bulk Cargo Heat Shutoff Valve - Removal/Installation
       21-44-04 * Bulk Cargo Heat Control Valve - Removal/Installation
       21-44-05 * Aft Cargo Temperature Switches - Removal/Installation
       21-44-06 * Bulk Cargo Temperature Switches - Removal/Installation
       21-44-07 * Bulk Cargo Temperature Sensor Fan - Removal/Installation
    21-45-00 * SUPPLEMENTAL HEATING SYSTEMS - DESCRIPTION AND OPERATION - MAINTENANCE PRACTICES - ADJUSTMENT TEST
       
    21-45-10 * Flight Compartment Supplemental Heating System - Description and Operation - Adjustment Test

    To be continued.....
    1. View Thread →
    0
    0
    0
    0
    0
    0
    Post is under moderation
    Stream item published successfully. Item will now be visible on your stream.
Unable to load tooltip content.